100% Guarantee to Pass Your Certification I HP Certification I exam and get your Certification I HP Certification I Certification. We guarantee your success in the first attempt. If you do not pass the HP0-S12 exam (Implementing HP ProLiant ML/DL Servers) on your first attempt we will give you a FULL REFUND of your purchasing fee AND send you another same value product for free.

33. You are required to provide a UPS solution for a ProLiant DL380 G5 Packaged Cluster with MSA1000. All units are supplied with fully redundant power supplies (PSUs). The customer's goal is to provide proper shutdown in the event of an extended power outage.
Which guidelines are important as part of your recommended minimum solution? (Select two.)
A. The UPS should have a minimum of 2 load segments.
B. The UPS should have a minimum of 3 load segments.
C. The UPS should have a minimum of 6 load segments.
D. Provide one UPS of VA rating based on the sizing requir ements of the UPS Sizing Tool.
E. Provide one UPS of VA rating equal to at least 1.40 x the total maximum combined power requirements (watts) of all units.
Answer: BD

34. Without upgrading, how many SCSI channels does the Smart Array 6402 controller h ave?
A. 1
B. 2
C. 4
D. 6
Answer: B

35. What are the main reasons to ensure proper planning of an IT infrastructure solution for a new customer? (Select two.)
A. to avoid costly mistakes from the beginning
B. to allow a smoother upgrade path in the future
C. to allow solid planning of sales margin within this account
D. to demonstrate knowledge and understanding to the customer
E. to ensure a customer's commitment to you as a preferred partner
Answer: AB